Search results

  1. klungly

    CJ buggy build

    Cut some of the frame off, some more might need to go depending on where the new control arm brackets go. More of the tub is going to get cut as well.. I'm rethinking my transfer case, not sure I like how much it's clocked. I'm really thinking about springing for an atlas. Sent from my XT1585...
  2. klungly

    CJ buggy build

    Got some more work done tonight. Took the rear axle out. My garage keeps getting smaller. My goal is to be working on the new rear axle next week. I bought 50' of 2" .120" wall DOM today also. Sent from my XT1585 using WAYALIFE mobile app
  3. klungly

    CJ buggy build

    No turning back now. The back half is off. More still need to be cut off, but smaller pieces will be more manageable. Sent from my XT1585 using WAYALIFE mobile app
  4. klungly

    CJ buggy build

    I cut through but missed a couple tub mounts, I plan on getting them later tonight. Sent from my XT1585 using WAYALIFE mobile app
  5. klungly

    CJ buggy build

    . I've been finding wasps every now and then while working. Gotta love older vehicles that sat outside for summer. Sent from my XT1585 using WAYALIFE mobile app
  6. klungly

    CJ buggy build

    Took the gas tank out and removed all the wiring from the back half of the tub.. I taped off the section of tub that I need cut off and made a cut before I had to stop. Sent from my XT1585 using WAYALIFE mobile app
  7. klungly

    CJ buggy build

    Took off the rear bumper Sent from my XT1585 using WAYALIFE mobile app
  8. klungly

    CJ buggy build

    Worked a little more. The starter got put back in and I took out the rear seat. Sent from my XT1585 using WAYALIFE mobile app
  9. klungly

    CJ buggy build

    I got my transfer case bolted up to my transmission, it was a pain. I had to remove both exhaust pipes and cut a bracket off the frame. I need to make a cross member for the transmission and a mounting bracket for the transfer case. Next will be cutting the tub and frame to get ready to start...
  10. klungly

    CJ buggy build

    I took a brake from the drive line and made a stand for my tubing bender out of the old role cage. Sent from my XT1585 using WAYALIFE mobile app
  11. klungly

    CJ buggy build

    the exhaust pipes had to go so the transfer case would fit. There's still a bracket that needs to be cut off to make bolting it in easier. Sent from my XT1585 using WAYALIFE mobile app
  12. klungly

    CJ buggy build

    Sent from my XT1585 using WAYALIFE mobile app
  13. klungly

    CJ buggy build

    The new transmission is on its way in. The torque converter is giving me some trouble lining up with the transmission pump. Sent from my XT1585 using WAYALIFE mobile app
  14. klungly

    CJ buggy build

    I started the transmission swap today. The t18 transmission and Dana 20 transfer case were pulled out I started to bolted up the flex plate. A bolt was missing, probably got lost moving into the new house. Sent from my XT1585 using WAYALIFE mobile app
  15. klungly

    MERRY CHRISTMAS from WAYALIFE -- What did Santa Get Your Jeep?

    Sent from my XT1585 using WAYALIFE mobile app
  16. klungly

    CJ buggy build

    My amazing wife got me this for Christmas Sent from my XT1585 using WAYALIFE mobile app
  17. klungly

    CJ buggy build

    Role cage is completely off. Sent from my XT1585 using WAYALIFE mobile app
  18. klungly

    CJ buggy build

    . The portable band saw is awesome except when the pipe springs back and traps it lol. Sent from my XT1585 using WAYALIFE mobile app
  19. klungly

    CJ buggy build

    Started taking the foam off the role cage. There's a lot of rust, I was already planning on building a new one. Sent from my XT1585 using WAYALIFE mobile app
  20. klungly

    CJ buggy build

    My tubing bender is all but done. Next is fabricating a stand for it. I finally have a place to work on the CJ it self. As long as work at my job stays slow I'll be able to get tons of progress made. . Sent from my XT1585 using WAYALIFE mobile app
Top Bottom