JDDK
Member
Too dark tonite. 60 dollar shopping list: two 72" × 1inch steel square tubing, four 6inch x 3/8 bolts with matching washers and locknuts. Also two 1inch steel spacers with 3/8 holes to make 2inch risers. Finally 4 square thick washers w 3/8 holes. Everything at Home cheapo. Cut tubes at 55 inches. Drill 3/8 holes 49 apart for frnt rack and 50 apart for rear. Assembly order: bolt, washer,tubing, washer, two 1 inch spacers, rollbar, square washer,washer, locknut.