Time to start over again. Last time

Good point!!
Feels like he has more parts than keep time to get it installed.
Remember that it was at the dealerships body shop for the first 6 months last year. I'm going to try and get a few small things installed this week. If the weather doesn't get in the way. Mom said they had rain every day for the past 2 months
 
I reached out to LOD this morning about the rear bumper I ordered over Memorial Day weekend. The last email I got from LOD was that they were in the process of making a new batch, and that it was a 3 week leed time. They were sent to the powder coater last Friday. They are hopeful to get them back this week and ship out next week
 
I reached out to LOD this morning about the rear bumper I ordered over Memorial Day weekend. The last email I got from LOD was that they were in the process of making a new batch, and that it was a 3 week leed time. They were sent to the powder coater last Friday. They are hopeful to get them back this week and ship out next week
"3 weeks"
 
Just ordered 2 sets of these KC scene lights to go on the corners of the bedrack. I'll be getting the switch-pro installed in September or October when it cools off a bit in Mississippi. I'll install the lights at the same time. That's if they come in by then.
 

Attachments

  • Screenshot_2019-10-18_KC_HILITES_2_C-Series_C2_LED_Area_Flood_Light_System_-_328__15857.png
    Screenshot_2019-10-18_KC_HILITES_2_C-Series_C2_LED_Area_Flood_Light_System_-_328__15857.png
    392.3 KB · Views: 4
After looking at the KC Cyclone 6 pack light kit. The longest wire harness is only 16 ft. I'm thinking about just ordering 8 industrial lights instead of the 6 pack, and just running wire. Since I would have to add wire to the back 4. What do you guys think?
 
After looking at the KC Cyclone 6 pack light kit. The longest wire harness is only 16 ft. I'm thinking about just ordering 8 industrial lights instead of the 6 pack, and just running wire. Since I would have to add wire to the back 4. What do you guys think?
If it is equal quality I think it will be just fine and more cost effective.
 
All I see is a pile of parts accumulating!!!
Your parts horder!!!!!!!
I'm slowly getting things installed. The past couple of years have been a little rough. With the jeep being at the body shop for the first 6 months last year. Then finding out about Dad's health issues. The only thing that won't get done this year will be getting the lift installed. That's going to be around spring next year for that.
 
Top Bottom