Look great! Just have to have the rings cleaned up and recoated every year or two.
2015 JKUR AEV JK350
1985 CJ8 Scrambler
Been crazy busy and just now started to catch up on this awesome thread! Looking real good!!
Oh, also, I have the new brackets at powder coat now and hope to have them ready to ship right after Christmas. I would have had these sooner but the original batch was laser cut wrong. :rolleyes2:
Brown Santa has been busy. Arb air compressor, tire inflator kit, and KMC XD232 wheels are here. These wheels look amazing! I wish the rings where available polished with the satin black wheel. I’m sure these rings will look horrible after a few offroad trips.
View attachment 338854
View attachment 338856
Sent from my iPhone using WAYALIFE
Glad you didn't go Tampongonias .
Glad you didn't go Tampongonias .
More stuff! Getting close. The Evo suspension should get here before the weekend.
View attachment 339040
Sent from my iPhone using WAYALIFE
Getting closer! Most of the Evo Mfg Stage 4 Plus suspension arrived today. Still waiting on the box with the miscellaneous stuff like sway bar links, brake lines, hardware, etc. also still waiting on 4 tires. Must be delayed from the holidays. It’s been 9 days so far, and still estimating another 3 days.
Picked up 4 tpms sensors from my local dealer as well.
View attachment 339143
Sent from my iPhone using WAYALIFE
Getting closer! Most of the Evo Mfg Stage 4 Plus suspension arrived today. Still waiting on the box with the miscellaneous stuff like sway bar links, brake lines, hardware, etc. also still waiting on 4 tires. Must be delayed from the holidays. It’s been 9 days so far, and still estimating another 3 days.
Picked up 4 tpms sensors from my local dealer as well.
Nice. Which shocks are you getting?