Trail JK
Active Member
Thanks sir. ^^^this is what I plan on doing. It's taking forever to find the time, but I do want to tackle this install.
I've noticed people doing that on other builds. Fingers crossed, maybe test fit this weekend?
Thanks sir. ^^^this is what I plan on doing. It's taking forever to find the time, but I do want to tackle this install.
You get a cage?
All of that tape must have taken a while. Looks good though.
How did you scratch your skins to begin with?
Prep is always a pain. But I know for a fact I have at least two nutserts that are stripped. So the hassle of dealing with that, scrapping RTV and then trying to reinstall, would have been harder. It actually wasn't that bad though. Each side took about 1.5 hrs.
That looks nice with the red behind the cutouts!
Looking good man!
I've been meaning to order a table and I think you just gave me the inspiration to pull the trigger!
Looks great!
Does that table just bolt in to the tailgate?