I bought my house with Tesla installed. I had to basically take over the contract.
$160 a month, awesome, literally no power bill monthly.
Last August, the panels took a shit. Tesla says no problem. It’s warranty work. It’s covered. 4 months later still no panels. Don’t worry, we will refund you for no solar production
Spring hits, my roof gets half ripped off in a wind storm. I call Tesla and tell them, no problem, we will come out and fix them anyways.
They come out, say they won’t swap until the new roof is put on. At this point they say, 5k for removal and reinstallion.
what ! It’s under warranty, nope. Now you have to pay since we have to come out twice. What in the fuck. Whatever, I pay,
Finally they come out this September to finally install the new panels. 13 months later.
They fucked up my new roof and drilled holes not in the right place ( whole other story).
I requested the solar production review. Yup, we will credit, $230 for 4 months of 2023 with no solar production. We can’t look at 2024 until 2025 hits.
So, I’ve been paying Solar for an entire year, plus power for a whopping $230 back.
160 for 4 months is $640. They didn’t even give me enough for what I paid them, and no they don’t refund on what you pay per month on the contract.
I basically paid power for the last year , plus Solar that didn’t work and there’s not a fucking thing I can do, because contract.
$1920 to Tesla, another $2800 to power, plus 5k for solar removal.
Avoid Tesla at all cost.
$160 a month, awesome, literally no power bill monthly.
Last August, the panels took a shit. Tesla says no problem. It’s warranty work. It’s covered. 4 months later still no panels. Don’t worry, we will refund you for no solar production
Spring hits, my roof gets half ripped off in a wind storm. I call Tesla and tell them, no problem, we will come out and fix them anyways.
They come out, say they won’t swap until the new roof is put on. At this point they say, 5k for removal and reinstallion.
what ! It’s under warranty, nope. Now you have to pay since we have to come out twice. What in the fuck. Whatever, I pay,
Finally they come out this September to finally install the new panels. 13 months later.
They fucked up my new roof and drilled holes not in the right place ( whole other story).
I requested the solar production review. Yup, we will credit, $230 for 4 months of 2023 with no solar production. We can’t look at 2024 until 2025 hits.
So, I’ve been paying Solar for an entire year, plus power for a whopping $230 back.
160 for 4 months is $640. They didn’t even give me enough for what I paid them, and no they don’t refund on what you pay per month on the contract.
I basically paid power for the last year , plus Solar that didn’t work and there’s not a fucking thing I can do, because contract.
$1920 to Tesla, another $2800 to power, plus 5k for solar removal.
Avoid Tesla at all cost.