You know, some days are just better than the rest and really, today just happened to be one of those days. Being that I have so much to do on Moby to get him ready for our upcoming Moab trip, Cindy decided to take it upon herself to get our new bigass and super heavy 40x13.50 Toyo MT's mounted onto our new big and heavy ATX Chamber Pro II's!!
Here's a shot of all the wheels and tires ready to get installed.
Cindy installing the new valve stems.
Working the new wheels onto the new tires.
Flipping the tire over and positioning it on top of a bucket.
Here she is pounding the bead lip onto the edge of the wheel to help provide proper seating of the ring.
And the best part right here, me taking a photo of her working tirelessly as she slowly goes around tightening ALL the bolts by hand until they are at the proper torque spec! My arms and back are killing me just watching her
Finishing up by filling up the tire with some air until the back of the tire is seated on the bead.
The 1st of 5 done.
And here are ALL 5
Yes my friends, Cindy is a keeper