Lets see all the 4 doors!

ImageUploadedByWAYALIFE1435942369.390759.jpgImageUploadedByWAYALIFE1435942424.864316.jpg

Cliffhanger on a Tuesday - Moab
Engineer pass on a Friday - Ouray

It's was a great week of wheeling
 
Last edited:
LOVE the orange accents on the rings!!

Yeah I like the orange accents too! Awesome idea! Good looking rig!

Here is mine posting up in front of ORE after DTD. I was thinking of doing something like mikefishes but go red rings. What do yall think?

View attachment 151524

Btw mikefishes, sweet ride!

Petey, Thanks! I am digging them also, but I think my prep work for the paint must have been sub-par as it is flaking off. Gonna try and find a second set of rings for sale and see if there is a better way to go. Maybe powder-coat or have a pro shop do the work. I don't wanna have it "down" while I pull these and wait a few days for the paint to cure again. I've followed your build thread for a long while now. I'm excited to see "round two" as you get yours running again. Good luck!

Devonn, Thanks! I have a thing for that color and always wanted to work it in somewhere.

Dillard, I think red would look awesome. Sweet rig!
 
Few on the trail.
d2b74b008584b634b80ee7cfceaec496.jpg

e329e7bfb6d8f70518ce825fa1e7cd15.jpg

05f8a2ca21466223c2f60bd2883d1dde.jpg



Sent from my iPhone using Tapatalk
 
Wow I don't think I've ever actually seen anyone do that.

I really enjoy it. Hear a lot about how people don't like the way it looks down on the jk but I think it looks cool. The rock hard roll cage makes taking it down a lot easier. About 16 bolts and five minutes and it's up/down. Without the cage this is a lot more time consuming.
 

Attachments

  • 1437022762798.jpg
    1437022762798.jpg
    38.9 KB · Views: 248
Top Bottom